Order type
First Article Inspection (FAI)
Prototype, first article or first production delivery: you need evidence that holds up with your customer or in internal development. We inspect the agreed characteristics and document them so that every result remains traceable to the drawing.
Scope agreed up front
Complete to the drawing or limited to the function-relevant characteristics — defined before the order, not afterwards.
Numbered inspection sketch
The numbered inspection sketch is part of the report. Every characteristic is linked to its measured value.
Report templates
If your customer requires their own FAI template, we clarify this before the order — so the evidence arrives in the expected form.
If a contradictory statement in the drawing surfaces during measurement, we contact you before it becomes a dispute — on request with a concrete correction proposal from the
ISO GPS drawing review.
More on First Article Inspection →