Knowledge · Metrology

Buy measurement programs or write them yourself?

Metrology Christian Schärer · 22 April 2025
Metrologist checking the stylus on a coordinate measuring machine in the measuring laboratory

The question comes up in every measuring laboratory and every quality assurance department: write measurement programs in-house or buy them? There is no blanket answer. But there are criteria that let you work the question out for your own operation.

The starting point

In practice, in-house metrology swings between two states — both cost money, but in different ways.

Too little utilisation
Qualified staff and measuring equipment are not fully used. Fixed costs continue to run, and the investment contributes nothing.
Production peaks
The inspection workload exceeds capacity. Then either the lead time or the depth of inspection suffers — and with it the value of the measurement.

The shortage of skilled staff intensifies both. Getting up to speed on a 3D measuring system takes a long time, and experienced metrologists are in high demand.

What in-house programming really costs

Anyone comparing costs usually counts only the programming time. Four further items decide the outcome:

1
Machine time
If programming happens directly on the machine, the machine is not available for measuring. That time is missing from the inspection throughput.
2
Software and maintenance
Offline programming and simulation are expensive to acquire and to maintain — regardless of how many programs are created per year.
3
Keeping up with the standards
Measurement programs have to meet the applicable ISO GPS requirements. Standards change, and the knowledge has to be maintained.
4
Training and cover
If the person who programs is absent, the knowledge is not available. Training two people doubles the effort.

What external programming delivers

No machine downtime. The program is created offline on the digital twin and only brought to the machine for commissioning. Measurement strategy, probing points and datum system have already been reviewed by then.

Conforming and traceable. The specification on the drawing is reviewed before programming. Anything not specified measurably comes to light before the program, not in the audit.

Based on effort. You are billed for the effort actually incurred. Where the need recurs, this can be agreed as a block of hours.

Transferable knowledge. The programs delivered are documented and legible. They can be maintained in-house and serve as a template for the next parts.

What the decision turns on

Rather in-house
When new parts go into series production continuously, programming is a permanently staffed role, the software is in place, and the machine has capacity for commissioning.
Rather buy
When demand fluctuates, a new part has to be inspected at short notice, the drawing contains ISO GPS characteristics that are rare in-house, or the machine is fully loaded.

Five questions before you decide

  • How many programs are created per year — and how are they spread across the months?
  • What does an hour of machine time cost when it is occupied by programming?
  • Who programs when that person is not available?
  • Are the characteristics on the drawing specified unambiguously and measurably?
  • From what volume does your own software pay for itself?

The answers lie in your own figures, not in a general rule. Once you have them together, the decision is usually clear.

Next step
Work the question out together
We go through your situation: range of parts, inspection workload, available software and machine time. After that you know whether in-house programming pays off for you — and where the limit lies.
Get in touch →
Read next
Metrology String coding in MCOSMOS: the @ tool of parametric programming Read the article → Metrology Cutoff wavelength and undulations per revolution Read the article →
Christian Schärer
Christian Schärer
Owner and Managing Director · Standards committee Swissmem NK1
Published 22 April 2025